History:
1974: Demirer Holding founded.
1978: AnKa Kablo is added to the group
1980: Demirer Kablo established
1996: 108 measuring masts are erected in several regions of Turkey.
1998: First windfarm of Turkey became operational in Cesme with 1.5 MW nominal power.
2000: Bozcada Windfarm established as the 2. of Demirer and third of Turkey. (10.2 MW)
2002: Enercon Aero Rotor blade factory founded in Izmir.
2006: Mare Manastir windfarm (39.2 MW) started production in Cesme.
2007: Burgaz (14.9 MW) and Anemon (30.4 MW) windfarms became operational in Canakkale region..
2008: Sayalar windfarm (34.2 MW) in Manisa and Dares windfarm(29.6 MW)in Datca became operational.
2009: Camseki windfarm 20.8 MW in Uvecik Canakkale, Keltepe windfarm 20.7 MW inSusurluk Balıkesir became operational.
2010:In Manisa Kırkagaç 25.6 MW Kuyucak windfarm is established .Further 5 licenced projects are on the pipeline.
2011: In Balikesir Havran 16MW and in ve Izmir Seyitali 30MW windfarms became operatinal.Total installed power at the end of 2011 reached 302 MW.
2012: In Balikesir Kepsüt ,in Izmir Samurlu and Kozbeyli windfarms became partially operational. We are working on finishing these and developing 5 new projects won in 1st november 2007 tenders. As at the end of 2012, the total installed power reached 417 MW.
2013: 20MW added to Sayalar Windfarm.Total installed capacity is 437MW as end of 2013.
2014:Minor investments on existing windfarms are realized.
Total installed capacity is 444MW as end of 2014.
2015:Minor investments on existing windfarms are realized.
Poyrazgolu Windfarm became commercially active.
Total installed capacity is 502MW as end of 2015.
2016:Total installed capacity is 565.6MW as end of 2016.
2017:Total installed capacity is 608MW as end of 2017.
2018:Total installed capacity is 664MW as end of 2018.